Elevator - Exterior Construction
GALLERY: Elevator - Exterior Construction
-
081000-01 WB Image.jpg
-
081000 a SVUUS 3D Model view north north west.jpg
-
081000 b SVUUS 3D Model view to north west.jpg
-
081000 c SVUUS 3D Model view north east.jpg
-
081011 Shaft Building View.JPG
-
081027 Shaft Building View.JPG
-
081027 Truck Delivery Cropped.JPG
-
081027 Shaft Footing Construction Cropped2.jpg
-
081027 Shaft Footing In the pit 3.JPG
-
081030 Shaft Foundation 3.JPG
-
081030 South Side 2.JPG
Our new elevator takes no space from our existing building. Instead it transforms existing, windowed walls on the south side of the building into elevator doors and runs the elevator up the side of the building in a new shaft. A small machine room is also being built next to the shaft to house the electronics and motors and provide for maintenance access.
Excavation of the exterior shaft began in late October and is expected to be complete in November.